Amr Mohamed Abd-Elrahman Ismail
amroshp@gmail.com
+971589713245 https://www.linkedin.com/in/amr-mohamed1990/ Dubai UAE(until March 2018)
Personal Profile
Through working as QA/QC and site engineer I had a good experience in most of site execution and inspection activates which gave me a lot of good experience to deal with most of site problems.
Education
From 2008
–
To
2013
[
El-Shrouk Academy
]
[bachelor]
in
[Civil Engineering]
Total Grad
Good (69.9 %)
Final Year Personal Project
Reinforced Concrete Project.
Personal Project Degree
Excellent.
Work Summary
Company Role project Description Location
Duration
Rmc Raafat Miller Consulting
QA/QC Engineer
Cairo Festival City
5 Administrative bldgs. New cairo
6/2016_ 1/2018
Al-Radwan construction Company
Site engineer
15 may
15 Ordinary Buildings
15 may city
2/2016__6/2016
Midtown New cairo 7
Ordinary Buildings
New-cairo
5/2015__2/2016
Al-Eman Engineering Consulting Office
QA/QC Engineer
-------
12tower buildings
Naser-city,Cairo
2/2015__5/2015
------- 49
Ordinary Buildings
New cairo
4/2014__2/2015
Home & More for Construction Development
Site engineer
------- 5 villas
El-Shrouk City
12/2013
__
4/2014
Work Experience
From June.2016
–
Jan.2018 [
Rmc Raafat Miller Consulting, QA/QC Engineer]
Project
[5 administrative buildings, Cairo Festival City, 1/6/2016 _ 31/12/2017].
Responsibility:
Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract.
Review the contractor shop drawings before approve.
Co-ordinate with other disciplines (Arch, MEP).
Follow up & monitor site on going work
Reviewing all site tests with 3
rd
party to insure that all Martials accepted as per specs of the project.
Resolving any site problems.
Reviewing the start plane of each new activity to insure that
Contractor of the right path of the schedule plan.
Owner: Al-Futtaim Real estate SA.
From May.2015
–
June.2016 [
Al-Radwan construction Company,
Site engineer]
Project
[15 Ordinary Buildings, 15 May City, 400 million LE, 1/2/2016__1/6/2016].
Project
[7 Ordinary Buildings, Midtown New Cairo, Billion LE, 1/5/2015__31/5/2016].
Responsibility:
Responsible for Concrete and finishing activates.
checking technical designs and drawings to ensure that they are followed correctly
Attending meeting with clients & Consultants to satisfy their requirements.
To assist and coordinate all technical issues and site instructions to Project Manager.
Act as the main technical adviser on a construction site for subcontractors, craftspeople and operatives
Responsible for levelling activities.
Dealing with Concrete and finishing activates.
Reasonable for all site tests.
Determine the quantities of materials for each activity.
Prepare shop drawing or any missing data to sub-contractors.
Ensuring projects meet agreed specifications, budgets or timescales.
Making sure sites meet legal guidelines, health and safety requirements.
Report with all materials delivers to the site.
From Apr.2014
–
May.2015 [
Al-Eman Engineering Consulting Office, QA/QC Engineer]
Project
:
[12 tower buildings, Nasr City, 300 Million LE, 1/2/2015__30/4/2015].
Project
:
[49 Ordinary buildings, New Cairo, 340 Million LE, 4/2014__2/2015
]
.
Responsibility:
Reviewing shop drawings as per specs and tender drawings.
Inspect construction materials to comply with specifications.
Check surveying levels as per shop drawing levels.
Inspect construction materials as per specifications.
Inspect the civil works (excavation, concrete, steel, backfilling insulation and half interior finishing).
Co-ordinate with other disciplines (Arch, MEP).
Follow up & monitor site on going work
Response to contractors IR.
Resolving any site problems.
Reviewing the start plane of each new activity to insure that
Contractor of the right path of the schedule plan.
From Dec 2013
–
To Apr.2014 [
Home & More for Construction Development, Site engineer]
Project
:
[5 villas, 5 Million LE, El-Shrouk City]
Responsibility:
Design all missing structural Drawings.
Report with all materials delivers to the site.
Responsible for levelling activities.
Determines project activates costs by calculating laborers, materials, and related costs.
Dealing with Concrete and interior half finishing activates.
Reasonable for all site tests.
Determine the quantities of Materials for each activity.
Prepare shop drawing or any missing data to sub-contractors.
Ensuring projects meet agreed specifications, budgets or timescales.
Making sure sites meet legal guidelines, and health and safety requirements.
Liaising activates with consultant to manage the way of inspection.
Summer training
2012/2011/2010 [
El Nasr Housing and Construction company, 9 months]
Responsible for concert activates of shopping mall.
Training on Sap 2000 V5 & AutoCAD.
Using survey Devices (Total Station, theodolite, levelling).
Skills
PMP preparation Revit structure Primavera P6 AutoCAD Sap 2000 ETABS
Languages
Arabic
(Mother tongue)
English
(Very Good)
Japanese
(Elem.)
Personal information
●
Completed the Military service
●
Egyptian
●
28/8/1990